Kimball Technical DW/BI System Architecture

The Kimball technical system architecture separates the data and
processes comprising the DW/BI system into the backroom extract,
transformation and load (ETL) environment and the front room
presentation area, as illustrated in the following diagram.

Figure 1: Kimball technical system architecture diagram.

The Kimball technical system architecture focuses on the following components:

Backroom ETL Read More →

The Lorenz system is a system of ordinary differential equations first studied by Edward Lorenz. It is notable for having chaotic solutions for certain parameter values and initial conditions. In particular, the Lorenz attractor is a set of chaotic solutions of the Lorenz system. In popular media the 'butterfly effect' stems from the real-world implications Read More →

Analysez les risques dès le début du projet
Un projet se déroule généralement en 5 étapes :

La formalisation du besoin.

L’étude de faisabilité.

La conception.

La réalisation.

La finalisation.

1. La formalisation du besoin
C’est le moment où vous posez les bases de votre projet. Pour les gros projets, vous pourrez être amené à réaliser une étude d’opportunité mais le plus souvent pour Read More →